top of page

Chelsmford Parkway Development, Essex
Largely a new build project, managed by Bouygues. We were working for Gaywood Demolition Company on an existing building that was being kept, this job required a facade retention with minimal obstruction inside the building to allow the floors and existing frame to be demolished with a new steel frame erected around the RMD Design.


bottom of page